Linden Interlocking Cutover
RAILWAY SIGNAL INTERLOCKING CUTOVER
Bison Rail Systems provided interlocking cutover support for the redesign and testing of the Linden Interlocking on the Port Authority Transit Corporation (PATCO).
Conducted track circuit testing, electric locking testing, non-vital logic testing, and 36-hour cutover of the redesigned Linden Interlocking.
Provided comprehensive review of design drawing and test procedures.
Completed test records needed to finalize the cutover.

Location
PA
Client
William Wiedmann,
Vice President,
Burns Engineering
Phone: 856-701-1791
Email:
wwiedmann@burns-group.com
Services
-
Vital Interlocking Function Testing
-
Track Circuit Testing
-
Drawing And Test Procedure Review
-
Test Record Completion