top of page
Washington Metropolitan Area Rapid Transit Potomac Yards Station

Washington Metropolitan Area Rapid
Transit Potomac Yards Station

POTOMAC YARDS METRORAIL STATION

Developed Integrated Test Procedures for the WMATA Rail Operations Control Center (ROCC) to tie in new systems installed at Potomac Yards Station, which is a new, infill station constructed between the existing Regan National Airport Station and the existing Braddock Road Station.
 

Conducting integrated testing of all systems at the Potomac Yards Station with interfaces to the ROCC, the Potomac Yards Station Kiosk and the two existing stations, Regan, and Braddock.
 

Developed and implemented the design and construction phase systems integration program for the entire project. Conducting interface close out on-site, gathering artifacts to close out construction phase interface control documents (ICD).

  • Integrated test procedure development

  • Integrated Testing

  • Systems Integration program development and implementation

  • Cutover schedule development

Location

Washington, D.C.

Client

Daren Petroski, Vice President,
Burns Engineering
Phone: 267-746-0295
Email: dpetroski@burns-group.com

Services

  • Integrated test procedure development

  • Integrated Testing

  • Systems Integration program development and implementation

  • Cutover schedule development

Bison Rail Systems

63 Main St. 

Suite 204

Flemington, NJ 08822

Telephone: 908-642-4570

Email: BRSadmin@bisonrailsystems.net 

Bison Rail Systems is the provider of technical services that your organization needs to help your project succeed.
Bison is a value‐added MBE/DBE/SBE partner 

bottom of page